Putu Iron Ore Project
A 4,000m drilling programme, including 11 drill holes, was completed on a 2.6km section of the ridge in 2010. The maximum drill depth was been 400m. Drilling on four out of the 11 holes ended in mineralisation. The first hole that was drilled across 63m returned 63.54% iron, including contained haematite. The …
قرأ أكثر