Asphalt Recycling | Agg-Net
05 January, 2009. look to the future with RAP recycling. Every 10 to 20 years or so asphalt road surfaces require either partial or full replacement, due to the effects of ageing, damage or increased traffic loads. The used asphalt obtained during these repairs is often disposed of or used as a supporting layer in new road building.Web
قرأ أكثر