Silverado Gold Mines Ltd.: Exhibit 99.2
Note: The usual deleterious penalty elements are present, but substantially below penalty grades or allowable limits.This will result in the mine Sb product receiving top dollar. Gross Cost. The NI 43-101 report cost/T of $376 (p. 137 – 18.8.3, e.g.: $77/T mining cost = 20.5% of total/T cost) is in line with our estimated cost of approximately $300/T.Web
قرأ أكثر![](/images/whatsappp.png)